Located along the Jalan Buroh Road towards the Jurong Island check point, this
flyover was constructed to ease the traffic flow towards the island.
The flyover is designed to support the midspan without any column support by
introducing tension struts from pylons on both sides of midspan.
The height of the Pylon formwork was designed at 2,800mm in height and completed
in 8 casts with an F3 finish quality.
|
|
|
Heavy duty supportwork and special side formwork were supplied for the tension
strut. 20 ton quad shore support was provided both sides of vehicle access through
supportwork.
|
Tension struts from pylon slopes at about 17 degree from the horizontal. Steel
primary bearers and timber secondary bearers are used.
|
|
|
Special side formwork was design for tension struts and each strut was completed
in 3 casts.
|